The University of Iowa’s utility system operator, ENGIE, is beginning a multi-year project along T. Anne Cleary Walkway to improve the reliability of the existing utility distribution system. A section of the Currier Tunnel, an underground utility tunnel that runs underneath T. Anne Cleary Walkway, needs to be replaced due to its age and condition.
The T. Anne Cleary Utilities Reconstruction project includes two enabling projects that will support reliable utilities to nearby campus buildings during construction on the Currier Tunnel replacement.
Construction on the two enabling projects are expected to begin in fall 2026 and last until summer 2027. Work on utility tunnel is expected to start in fall 2027 and continue for three to four years.
Why is this project needed?
While some sections of the utility tunnel have been repaired or rebuilt over time, this project targets a section that is mainly in original condition, dating back to the 1930s. The underground tunnel and adjacent piping provide essential utilities to campus, including chilled water and steam for cooling and heating buildings, among other essential functions.
Have questions? Check out Frequently Asked Questions about this project.
Want to know more about active closures?
For the most up to date information on active closures and related details like alternate and accessible routes, visit the Access and Construction Alerts page.
Increasing reliability of utilities to critical campus buildings
Upgrades to the utility infrastructure along T. Anne Cleary Walkway will support reliable utility services to buildings in the area, including the Pappajohn Business Building, Chemistry Building, Pomerantz Center, and more.
Prioritizing safety for our crews and campus
The age and condition of this section of the Currier Tunnel does not meet University of Iowa and ENGIE standards for workplace access. The Currier Tunnel replacement will create safer conditions for utility crews and the campus community.
Supporting critical university functions
T. Anne Cleary Walkway is home to facilities that support core university functions of student success, including student services, academic programs, research, housing, and dining. Reliable utility service is essential to keeping these spaces operating and supporting the university’s mission.
Enabling Projects
Before work begins on the Currier Tunnel, two enabling projects are planned to improve system reliability during construction on the Currier Tunnel. Construction is expected to begin in fall 2026 and last until summer 2027.
Frequently Asked Questions
Why is this project happening now?
The infrastructure that supports these utilities needs repair due to its age and condition. This project is needed to continue supporting reliable utility services to the buildings along the T. Anne Cleary Walkway. Delaying poses a risk of unplanned utilities outages and failures that pose risk of damage and additional costs.
This project is part of a larger utilities master plan developed in partnership with the University of Iowa and ENGIE to support campus need.
When will this project be completed?
Design and engineering for the T. Anne Cleary Utilities Reconstruction Project, including enabling projects began in early 2026, with construction to begin on the Bloomington Street Steam Line Replacement Project and Chilled Water River Crossing Project to start in fall 2026 through summer 2027.
Design and engineering for the Currier Tunnel Replacement Project started in June 2026 and is anticipated to last approximately 1 year. Construction is anticipated to start in fall 2027 and last for approximately 3 to 4 years.
The project team is working to plan for and manage campus impacts while prioritizing the safety of all who use the area.