Finkbine Commuter Lot (Lot 65) - Replace Select Areas of Asphalt Surface with Concrete
Category
Parking Lot Closure
Dates of closure/impact
-
Reason and details for closure/impact
This project includes the removal of approximately 8,500 square yards of existing asphalt pavement, to be replaced with concrete pavement, along with minor grading and excavation work. The project will be completed in phases.
In phase one, 141 parking stalls will be impacted. All active work areas will be securely fenced off for safety. Pedestrian sidewalk access and two-way traffic will be maintained throughout the duration of the work.
Traffic control
No
Traffic control plan
Accessible route
Pedestrian sidewalk access and two-way traffic will be maintained throughout the duration of the work.
Alternate route
Pedestrian sidewalk access and two-way traffic will be maintained throughout the duration of the work.
Project number
1164101