Carver Pavilion - UIHC-IPT-Construct Building
Category
Road Closure
Sidewalk Closure
Dates of closure/impact
-
Building
Traffic control
Yes
Traffic control plan
Accessible route
No complete closure of the road.
Alternate route
No complete closure of the road.
Reason and details for closure/impact
Due to the construction of the new Inpatient Tower, soil testing will be required as part of the design process. On January 18, three to four locations will undergo Cone Penetration Testing (CPT), as indicated in the attached figure. Each location will require 2 to 3 hours of operation. While this activity will not completely close the road, it will block one to two lanes at each location. A traffic control vendor will manage the site, and the map illustrates the size of the machinery used for the tests.
Project number
1037301