Library - Correct Structural Deficiencies in Deck Above Loading Dock
Project number
1177201
Project building
Project scope
This project will utilize a structural study that was conducted in September of 2025 to repair some "T" beam supports within the Library loading dock area.
Project status
Design
Square Footage
3,639
Project Budget
$148,333.00
Construction start date
Substantial completion date
Awarded to
E & H Restoration LLC
Architect(s)
Raker Rhodes Engineering LLC