Hospital Parking Ramp 3 (Lot 80) - Repair Active Leaks into Chilled Water Plant and Stormwater Drain System

Project number
1107501
Project scope
This project will study on the HPR3 and Chiller Water Plant 1 to determine storm water drain system and roof leaks.
Project status
Design
Project Budget
$579,000.00
Architect(s)
Shive Hattery Incorporated