Visual Arts Building - Repair exterior steel panels
Category
Building Entrance Closure
Sidewalk Closure
Dates of closure/impact
-
Building
Reason and details for closure/impact
Please be advised that Entrance 2 (the east-facing entrance), along with a portion of the sidewalk directly in front of this entrance, will be closed from March 2 through March 4, between the hours of 7:00 a.m. and 5:00 p.m. each day.
This closure is necessary for the placement of a lift and to complete repairs to the exterior steel siding on the building. Please avoid the barricaded work area and use alternate building entrances during the closure period.
Normal access will be restored outside the posted working hours, and all efforts will be made to minimize disruption.
Traffic control
Yes
Traffic control plan
Accessible route
Additional accessible entrances are available at Entrance 3 (southwest side of the Visual Arts Building, facing the courtyard between the Visual Arts Building and Art Building West) and Entrance 4 (southwest middle of the Visual Arts Building, also facing Art Building West).
Alternate route
All sidewalks on south/southwest side of building will be available. Sidewalks along North Riverside Drive and River Street will be open as well.
Project number
1166601