University of Iowa Stead Family Children's Hospital - Bid Package #12 - Colloton Connector Tunnel
Project number
0111012
Project building
Project scope
University of Iowa Hospitals and Clinics Childrens Hospital Bid Package #12 Colloton
Connector Tunnel (208-009-12/0111012) includes the extending a current Lower Level 1 tunnel
into the existing Colloton Lower level. This tunnel extension construction will be a concrete filled deck with rated partitions. The package also includes an extensive rework of existing major electrical conduits, circuits and switchgear which feed and serves several medically critical areas of the existing building.
Connector Tunnel (208-009-12/0111012) includes the extending a current Lower Level 1 tunnel
into the existing Colloton Lower level. This tunnel extension construction will be a concrete filled deck with rated partitions. The package also includes an extensive rework of existing major electrical conduits, circuits and switchgear which feed and serves several medically critical areas of the existing building.
Project status
Hospital Close
Project Budget
$783,957.00
Construction start date
Substantial completion date
Awarded to
Knutson Construction Services Midwest Inc