Davenport Street and Capitol Street south of Stanley Hall - Repair Stanley Hall Exterior Masonry

Category
Road Closure
Sidewalk Closure
Other
Dates of closure/impact
-
Building
Reason and details for closure/impact

The corner of Davenport Street and Capitol Street south of Stanley Hall will be closed to allow for a crane to set up and lift materials from the roof of Stanley Hall to repair exterior masonry on the building. The loading dock to Stanley Hall will be closed. 

Traffic control
No
Traffic control plan
Accessible route
The area around Burge Hall will remain open and accessible from Clinton Street. Only the northwest corner will be blocked off.
Alternate route
The area around Burge Hall will remain open and accessible from Clinton Street. The Burge Hall loading dock will remain open.
Project number
1096101