Building announcements
College of Public Health Drive Closure - ENGIE water main project
ENGIE contractors will close the drive leading to the College of Public Health Building beginning Thursday, July 23, 2026, and will reopen the drive on Thursday, August 13, 2026.
This closure is necessary to allow contractors to connect the north and south sections of the water main beneath the...
College of Public Health Building Sidewalk - ENGIE install new water main
Correction: An earlier version of this alert had incorrect closure dates. The correct closure dates are listed above.
Engie contractors will be closing the sidewalk around the circular driveway leading to the College of Public Health building. This closure is to allow connecting the new water main...
Area
156,697.62sq. ft.
Year built
2011
Ownership
Owned
Contact
Primary Building Coordinator:
Welsh, Kathy
Alternate Building Coordinators:
Cranston, Lori
Cranston, Lori
Hours
Monday: 7:00am - 6:00pm
Tuesday: 7:00am - 6:00pm
Wednesday: 7:00am - 6:00pm
Thursday: 7:00am - 6:00pm
Friday: 7:00am - 6:00pm
Saturday: Closed
Sunday: Closed
Tuesday: 7:00am - 6:00pm
Wednesday: 7:00am - 6:00pm
Thursday: 7:00am - 6:00pm
Friday: 7:00am - 6:00pm
Saturday: Closed
Sunday: Closed
Disclaimer Statement
Public operating hours for campus buildings are displayed, excluding holidays, academic breaks, and special events. These hours do not represent office business hours. Access to buildings during closed hours is permitted via the Iowa One Card for approved faculty, staff, and students. For Hospital 24/7 entrances, visitor guidelines, and information, please visit the UI Health Care website.
Multi-user restrooms - men
N291, N391, N491, N591, S047, S124
Multi-user restrooms - women
C110, N294, N394, N494, N594, S049
Single user restrooms
S040, S044, S046
Floor LL, room S042
Facility equipment
Medela Symphony Pump
Access information
Key access
Resource contact
Floor LL, room XS020
Facility equipment
Model: On-Site
Additional location guide
Outside room S047
Floor 01, room XS105
Facility equipment
Model: On-Site
Additional location guide
In corridor of XST102
Floor 02, room XC200
Facility equipment
Model: On-Site
Additional location guide
2nd Floor Atrium - Center
Floor 03, room S300
Facility equipment
Model: On-Site
Additional location guide
Outside XST302
Floor 04, room S400
Facility equipment
Model: On-Site
Additional location guide
Outside XST402
Floor 05, room XC500
Facility equipment
Model: On-Site
Additional location guide
Outside XST502
Floor 01, room XS105
Facility equipment
Kit: 8 kit pack; zippered
Additional location guide
Outside room S106A
Artwork