The right lane of the eastbound Hawkins Drive will be temporarily closed to accommodate loading equipment that is no longer needed for the construction of the vault replacement project. Equipment loading is scheduled between 7:00 a.m. and 12:00 p.m., depending on the truck’s arrival time. The area will not be closed for the entire duration—only while the truck is actively being unloaded.
Traffic control
Yes
Accessible route
Individuals traveling eastbound on Hawkins Drive near the Chilled Water Plant 1 & 2 and Ramp 3 will need to merge into the inside lane due to the loading zone area.
Alternate route
Individuals traveling eastbound on Hawkins Drive near the Chilled Water Plant 1 & 2 and Ramp 3 will need to merge into the inside lane due to the loading zone area.