The right lane of the westbound Hawkins Drive will be temporarily closed to accommodate unloading materials related to the Engie vault replacement project. Material unloading is scheduled between 7:00 a.m. and 1:00 p.m., depending on the truck’s arrival time. The area will not be closed for the entire duration—only while the truck is actively being unloaded.

Traffic control
Yes
Traffic control plan
Accessible route
Individuals traveling westbound on Hawkins Drive near the Wendell Johnson Speech and Hearing Center will need to merge into the inside lane due to the loading zone area.
Alternate route
Individuals traveling westbound on Hawkins Drive near the Wendell Johnson Speech and Hearing Center will need to merge into the inside lane due to the loading zone area.
Project number
149-24-LFC