Construction will occur at the south-facing Entrance 8 of the Blank Honors Center to replace the existing exterior doors. Work will include removal and replacement of doors, frames, and hardware, exterior concrete repairs, and installation of a bollard to relocate the automatic door opener hardware for improved accessibility.
Traffic control
No
Traffic control plan
Accessible route
Accessible entrances are available on the north side of the building at Entrance 1 and Entrance 3.
Alternate route
Alternate entrances are available on the north side of the building.
Project number
1015001