Construct Arena Ramp - Phase 2B - New Patient Drop-off Circle Opening & Dental Science Building West Entrance Closure

Category
Building Entrance Closure
Parking Lot Closure
Sidewalk Closure
Dates of closure/impact
-
Reason and details for closure/impact

Phase 2B: As part of Phase 2B, a new permanent patient drop-off circle will open on July 21 and be accessible from Newton Road. The former drop-off circle accessed from Elliott Drive will be permanently closed. This phase will also require the closure of the west entrance of the Dental Science Building from July 21 to August 3 for installation of a new snow melt system. The main entrance (located just northeast of the west entrance) will remain open. Staff will provide ADA assistance for patients using the main entrance for the duration of this closure.

Traffic control
No
Traffic control plan
Accessible route
To access the Dental Science Building, use the new patient drop-off circle accessible from Newton Road. Follow the sidewalk and ramp to the main entrance. Staff will provide ADA assistance for patients using the main entrance throughout the closure.
Alternate route
Patients may use the patient parking lots located to the west of the Dental Science Building (accessible from Elliott Drive) and follow pedestrian pathways around construction areas to reach the main entrance.
Project number