Repair Hillside at Church and Clinton Street

Category
Sidewalk Closure
Dates of closure
-
Traffic control
Yes
Traffic control plan
Accessible route
All pedestrians will be routed to the South side of Church Street and the East side of Clinton Street.
Alternate route
All pedestrians will be routed to the South side of Church Street and the East side of Clinton Street.
Reason and details for closure

Sidewalk will be closed for project work associated with restoration of Hillside at the intersection of Clinton and Church Streets. The sidewalk will be opened no later than 8/16/24 for Fall 2024 move in week. Work may need to continue again starting 8/26/2024 which will require additional sidewalk closure.

Project number
1001301