Dental Science Building and Carver-Hawkeye Arena - ENGIE replace steam/condensate

Category
Road Closure
Sidewalk Closure
Dates of closure/impact
-
Reason and details for closure/impact

We need to narrow the north bound lane of Elliott Dr. to dig up the new steam line to investigate why the pull cable for the leak detection is stuck. We will maintain a minimum of 11' for both lanes.

Traffic control
Yes
Traffic control plan
Accessible route
Sidewalk west of Elliott Dr.
Alternate route
N/A
Project number
ENGIE 17-21/35-22 LFC