North Campus Parking and Chilled Water Facility - Chilled water plant 4 replace chiller 3
Category
Road Closure
Dates of closure/impact
-
Reason and details for closure/impact
A section of Capitol Street between the Davenport Street and the Burge Hall loading dock will be closed for assembly of a crane and chiller equipment. This area will be fenced off to prevent pedestrians from walking through the work zone.
Traffic control
No
Traffic control plan
Accessible route
Vehicles and pedestrians will be routed east around Burge Hall to Clinton Street during this time.
Alternate route
The skybridge between Catlett Hall and Capitol Street will remain open for pedestrians.
Project number
175-25-EXP ENGIE